Further to the study carried out with elec calc™, and in order to guarantee the selectivity of the installations, it was proposed to the customer to start with a new LVB equipped with recent circuit breakers with electronic triggers, therefore with much finer settings that allow for end-to-end selectivity of the installation.
“In this specific case, the integration of the manufacturers’ equipment and the precision of the software made it possible to deliver a precise study that highlighted the need to replace the existing equipment and thus guarantee the continuity of the building’s operation.”