elecworks implementation necessitates a preceding reflexion on the configuration system of a project (see further the chapter dedicated to the configuration). Once the configuration choice realised, the realisation of a project is very simple and direct.
Realisation of connections, insertion of symbols, insertion of type plans/macro, insertion of borders and creation of electrical cabinet, allocation of manufacturers’ references, choice of cables, cabinet layout, work on the synoptic, …
The order imports not much, a strong point of elecworks is the possibility to create data of the project, in the order the most relevant for the designer. Indeed the database can be provided by one or the other of the functions of the product, whether it be in Manufacturer reference mode, or in developed diagram, synoptic. It is thus possible to get out the parts list of the project without starting the diagram.